
Walk-in showers
Open, easy-to-use shower layouts with precise drainage, comfortable entry, built-in niches, bench options, and glass details planned around the room rather than forced in at the end.
Best for primary suites and daily-use bathrooms.Frameless walk-in showers, curbless wet rooms, steam-ready enclosures, and tub-to-shower conversions designed for Southern California homes.
A shower remodel is the highest-impact bathroom project per dollar -- and the one most homeowners outgrow first. Yanis Remodeling designs and builds frameless walk-in showers, curbless wet rooms, steam-ready enclosures, and tub-to-shower conversions across Orange County and Los Angeles.
A complete shower scope can include demolition, substrate preparation, commercial-grade waterproofing, tile or stone installation, drain selection, shower niches, benches, glass, fixtures, lighting coordination, and ventilation planning. Every shower is sloped for real-world use and finished with materials selected for how they age in Southern California homes.
CSLB #1093072. 5.0-star Google rating from 27 reviews. Irvine studio at 5 Holland, STE 219.

Open, easy-to-use shower layouts with precise drainage, comfortable entry, built-in niches, bench options, and glass details planned around the room rather than forced in at the end.
Best for primary suites and daily-use bathrooms.
Low-profile glass enclosures keep the shower visually light while showing the stone, tile, and fixtures. We coordinate blocking, hardware, swing clearance, and water containment before tile begins.
Best for homeowners who want a clean architectural look.
A curbless shower depends on disciplined slope, drain placement, waterproofing, and glass planning. The result is a quiet, accessible, high-end bathroom that feels larger than a standard shower enclosure.
Best for aging-in-place planning and modern primary bathrooms.
Replacing an underused tub with a tailored shower can improve daily function without committing to a full bathroom rebuild. We evaluate plumbing, waterproofing, tile transitions, and resale considerations before recommending the scope.
Best for secondary bathrooms and older layouts.
Every shower starts below the surface: substrate preparation, waterproof membranes, sealed corners, flood testing, and drainage planning before tile is installed. We avoid naming a system until project specifications are confirmed.
Large-format porcelain, natural stone, mosaic shower floors, and textured tile are selected for slip resistance, maintenance, light response, and long-term moisture performance.
Linear drains, point drains, curbless entries, and benches all depend on precise slope. We resolve drainage early so the finished shower looks clean and performs properly.
Frameless glass, rain heads, hand showers, body sprays, niches, towel placement, and lighting are coordinated as one system so the shower feels intentional from every angle.
Custom Proposal
Shower remodel investment depends on demolition, plumbing changes, waterproofing scope, tile or stone selection, glass, fixture package, and whether the project is shower-only or part of a full bathroom remodel. We are leaving published pricing off this page until the campaign pricing gate is confirmed.
Bathrooms are half of everything we do. Our team plans shower remodels around the hidden construction details that make luxury finishes last: waterproofing, drainage, ventilation, blocking, glass alignment, and material compatibility.
A shower remodel is a small footprint with very little tolerance for mistakes. Our process keeps design, waterproofing, tile, glass, and fixtures coordinated from the first site visit.
We inspect the current shower, tub, plumbing locations, ventilation, drainage, framing, and moisture risk. This tells us whether a shower-only remodel is appropriate or whether the broader bathroom needs attention.
We plan entry style, glass lines, niches, benches, fixture placement, tile format, drain position, and how the shower connects to the rest of the bathroom.
The existing shower or tub is removed, the substrate is rebuilt, waterproofing is installed, and wet areas are tested before finish materials are placed.
Tile or stone is installed with clean lines and proper slope. Glass, valves, shower heads, drains, lighting details, and accessories are fitted and checked for daily use.
We remodel showers in the same communities already represented across the Yanis service-area pages, including Newport Beach, Laguna Beach, Irvine, Huntington Beach, Costa Mesa, Dana Point, Beverly Hills, Santa Monica, and Pasadena.
For Orange County-specific cost, permitting, and city guidance, visit our bathroom remodeling Orange County page. To see a real tub-to-shower conversion, read our Mission Viejo before & after case study.
Most shower remodels take about 3 to 6 weeks once design, materials, and scheduling are approved. The exact timeline depends on demolition, plumbing changes, waterproofing, tile complexity, glass fabrication, and whether the shower is part of a full bathroom remodel.
It depends on the home and bathroom count. In a primary bathroom, a well-designed walk-in shower can improve daily function and luxury appeal. In homes with only one tub, keeping at least one bathtub may matter for resale. We review the full home before recommending a tub-to-shower conversion.
A curbless shower has little or no raised threshold between the bathroom floor and shower floor. It can make a bathroom feel larger, cleaner, and easier to enter, but it requires careful slope, drain placement, and waterproofing to perform properly.
Yes. Tub-to-shower conversions are common when the existing tub is underused or makes the bathroom feel cramped. We evaluate plumbing, drain position, wall condition, tile transitions, glass layout, and resale considerations before finalizing the scope.
Yes. A steam shower needs a sealed enclosure, sloped ceiling, steam generator, controls, vapor-rated waterproofing, and ventilation planning. If steam is the goal, visit our steam spa page for the more specialized requirements.
A permit may be needed when plumbing, waterproofing, electrical, or structural elements change. Cosmetic work in the same locations may be handled differently by each city. Yanis Remodeling reviews permit requirements as part of the design-build process.
We specify commercial-grade waterproofing based on the project conditions, substrate, shower type, and finish materials. Named product systems should be confirmed during project specification, so this page avoids publishing unverified brand claims.
Shower remodel pricing depends on demolition, waterproofing, tile or stone, glass, fixtures, plumbing changes, and whether the work is shower-only or part of a larger bathroom remodel. For local cost context, see our Orange County bathroom remodeling page or request a custom proposal.

Tell us what is failing in your current shower. We will review scope, waterproofing, layout, glass, and material options for your home.